Friday, May 8, 2015

Members Profile Send Private Message Find Members Posts Visit Members Homepage Add to Buddy List Se


Members Profile Send Private Message Find Members Posts Visit Members Homepage Add to Buddy List Infraction Group Joined: 25-Jun-2008 Online Status: Offline Posts: 3005 Quote Reply # 1 Topic: From the region Posted: 12-Jan-2009 at 17:32
does anyone know what this project for a municipal building in Pristina? seen daylight or remained only on paper !? this interesting prospect with stairs flavor trends 2013 although flavor trends 2013 already seen, but little bragging conclusion of this project in my opinion, way better fortunes would water a mall or part of mall ... have something renderings and Lukoil and this is my suspicion flavor trends 2013 is realized!
Members Profile Send Private Message Find Members Posts Visit Members Homepage Add to Buddy List Infraction Group Joined: flavor trends 2013 25-Jun-2008 Online Status: Offline Posts: 3005 Quote Reply # 2 Posted: flavor trends 2013 12-Jan-2009 at 18:34
Originally posted by pbanks Originally flavor trends 2013 posted by beTon aha little confused after separate new thread, but my conference was whether renderive realized or not! vaka od prva nemozam da kazam. flavor trends 2013 Vo listata vidov proekti vo Skopje koi se vekej realizirani. Primetiv deka tesno sorabotuvaat so Megaron i mi tekna deka voopsto ne ni teknalo niv da gi pobarame na web. Mislam deka tuka imas del od odgovorite kolku sto dzirnav http://www.megaron.com.mk
Members Profile Send Private Message Find Members Posts Add to Buddy List Senior Member Joined: 18-Aug-2008 Online Status: Offline flavor trends 2013 Posts: 156 Quote Reply # 3 Posted: 15-Mar-2009 at 16:58
Members Profile Send Private Message Find Members Posts Add to Buddy List Senior Member Joined: 18-Aug-2008 Online Status: Offline Posts: 156 Quote Reply # 4 Posted: 15-Mar-2009 at 17:17
Members Profile Send Private Message Find Members Posts Visit Members Homepage Add to Buddy List Senior Member Joined: 19-Feb-2008 Online Status: Offline Posts: 4217 Quote Reply # 5 Posted: 31-Mar-2009 at 11:49
This he just had sliknato some time ago, a trade in a neglected part (slum) of Thessaloniki, near the ports. I have not seen him a lot, but much better than it looks. flavor trends 2013 However, light years ahead of ours, though not seen the picture. Edited by gitardemon - 31-Mar-2009 at 11:50
Members Profile Send Private Message Find Members Posts Add to Buddy List Senior Member Joined: flavor trends 2013 18-Aug-2008 Online Status: Offline Posts: 156 Quote Reply # 6 Posted: 28-Apr-2009 at 12:52
Members Profile Send Private flavor trends 2013 Message Find Members Posts Add to Buddy List Senior Member Joined: 20-Oct-2008 Location: Ljubljana Online Status: Offline Posts: 2951 Quote Reply # 7 Posted: 23-Jun-2009 at 22:49
HERMES flavor trends 2013 PARK (HERMES PARK MALL, CAREFFOUR & EUROPEAN TRADE CENTER) SOFIA, BULGARIA flavor trends 2013 is a whole group of buildings, which is currently being constructed in Sofia under the name Hermes Park. It is built by Kerfur blvd. Tsarigradsko Shosse and is 6.5 km away from the city center and 4.5 km from Sofia Airport. Once built, it will be the largest shopping mall and business center in the Balkans. Full built-up area 240,000 square meters investment 200 million Start of construction in December 2007 End of construction in January 2010 Hermes Pakr Mall: The mall should cover an area of 66 000 square kvardatni, plus another 24,000 square meters, which will be situated and Hypermarket Kerfur, who is also an investor of the building. Above the building of petrol rises office building F, which is part of the European Trade Center. European Trade Center: This part of the park is intended exclusively for business premises and offices of class A (razvrstuvanje that scale of business spaces is probably Europe as seen in Slovenia). The total area of the premises will be 68,000 square meters. It includes six office buildings A, B, C, D, E, F, sequentially. The highest, Building A rises above the Boulevard and is 18 storey. Each subsequent building (B to E) is less floors to the final building is a 8 ply. The center will be equipped flavor trends 2013 with so-called green technologies to optimize space, flavor trends 2013 self-generating energy using solar batteries and technologies for saving energy. A building will have 6 quick lift, and every other building will have 4 quick lift, riding 3 m / s. Edited by pbanks - 31-Oct-2009 at 15:26 Andrej_LJ
Members Profile Send Private Message Find Members Posts Add to Buddy List Senior Member Joined: 20-Oct-2008 Location: Ljubljana Online Status: Offline Posts: 2951 Quote Reply # 8 Posted: 23-Jun-2009 at 22:55
The start of construction in December 2007: Early 2008: in April 2008 when the site worked 14 cranes, 3 Semnan: November 2008: Construction of Meto Line 1 (Line 4 and in the future), and link with underground parking It has a capacity of 1830 seats. February 2009: Edited by p

No comments:

Post a Comment